MRT Putrajaya Line (PYL)
Malaysia’s longest and newest MRT line connecting Kwasa Damansara to Putrajaya Sentral (Phase 1 & 2); 57.7 km with 36 stations opened 2023; the new backbone of the Klang Valley network. (Prasarana Malaysia Berhad / MRT Corp)
Malaysia’s longest and newest MRT line connecting Kwasa Damansara to Putrajaya Sentral (Phase 1 & 2); 57.7 km with 36 stations opened 2023; the new backbone of the Klang Valley network. (Prasarana Malaysia Berhad / MRT Corp)